Code Consultants Save Hotel over $200,000/Facility in Construction Costs
News,Success Stories,AHJ Negotiations,Code Analysis
January 25, 2011
Our code consultants were retained to perform a code equivalency analysis for a client that owns and operates hotels. These hotels are typically three stories tall and of wood frame construction. Each unit is made up of…
Computer Fire Modeling
News,Success Stories,AHJ Negotiations,Code Analysis,Fire Modeling
January 25, 2011
Our client built a 710,000-ft2 build-to-suit distribution center in Kentucky leased to ultimately house automotive replacement parts. The facility contains several three-level hand pick racks. The top level is 20 ft. above the…
- 1
- 2